2018.06.04. Progress Report

Think that the plan is too tight. It was little bit tight from the beginning, thought that it would be fine once I get used to live in the plan. However, the reality was not like what I though so. Since there are too many objects in short duration, once I missed one schedule somehow, it was easy to missed several the other schedules out of lost morality, and unexpected events. Thus need to fix the schedule. Must give up some objectives (or plan for other time period), and leave some empty time along with set longer of task duration (easier to achieve, higher morality). Focusing on achieving goals by   priority order, and make sure that the one with higher priority is must need to be done.

Finished Project Outline up to Change Control management.

Studied Chinese 100 | 1set | 150

Fixed Plan & Daily Schedule.

 